Custom homes in Johns Creek
Building in Johns Creek often means an infill lot or a teardown in an established neighborhood. The city's submittal checklist is detailed, and lots near the Chattahoochee add a River Corridor review.
Building a custom home in Johns Creek
The Johns Creek Community Development Building Division issues residential permits. A new single-family submittal needs a full site plan with a survey by a licensed land surveyor, Fulton County sewer and water permits, and Manual J and Manual S HVAC sizing reports.
Pools and retaining walls are permitted separately from the house.
What to know before you build in Johns Creek
Licensed survey
The site plan must include a survey by a licensed land surveyor.
Fulton County sewer and water
New homes need Fulton County sewer and water permits as part of the submittal.
HVAC sizing reports
Manual J and Manual S reports are required, so the HVAC design is done before permitting, not during framing.
Chattahoochee River Corridor
Properties in the River Corridor need an as-built survey and a Hold & Release Affidavit.
Stream buffers
Johns Creek requires a 50-foot undisturbed stream buffer plus a 25-foot impervious setback.
Separate permits
Pools and retaining walls each need their own permit.
How we build
- Start with the land
We walk the lot with you before plans are final: access, slope, septic or sewer, buffers and where the house should sit.
- Open-book pricing
Custom homes are built cost-plus. You see the supplier and subcontractor invoices behind every draw, not a single lump number.
- Permits and plan review
We handle submittals with the city or county building office and coordinate the surveys, soil reports and engineering they require.
- On site, every day
Jerry runs the job in person. You get regular progress updates with photos, like the public build journal for Lakewood Lodge.
Keep reading
Other places we build
Sources
- Johns Creek — Building Permit Guidelines
- Johns Creek — Building Plan Submittal Checklist
- Johns Creek — Staff report citing stream buffer code
Rules and fees change. Confirm with the office before you rely on them. Last checked October 2026.
Talk to Jerry and Karen about your build.
Tell us about your land and your plans. We reply by phone or email.